Nick Coughlin Associates Ltd T/A The Furniture Group © 2017

"The advice, service, planning, build quality, tidiness and completion were all impeccable. A faultless experience as far as our team is concerned"
Dr David Chesover, Senior Partner, Thornhills Medical Practice

"We had an infection control inspection last Friday, the officer could not believe the difference to our clinical rooms. We passed with flying colours :)"
Julie Murphy, Practice Manager, Finchampstead Surgery

"Not only did the chap from the CQC take pictures of your skirting he also said that he thought it was a very high standard professional job as you had coved under/around the plug sockets which he didn't see that often! As far as he is concerned all the jobs have been excellently executed - so well done you deserve it."
Mairead Roche, Practice Manager, Rosslyn Hill Surgery

What our clients say:

November 7, 2018

 In March 2018, The Furniture Group designed and built 2 new consulting rooms within an under-utilised space in the surgery's reception area. These rooms incorporated new services: sinks, taps worktops, medical cabinets, desks, examination lamps, privacy curtains, coved flooring. The walls were painted in anti-bacterial paint. Electrics and data points were housed in wall mounted dado trunking. The windows were frosted for patient privacy. We also installed new vinyl flooring to the stairs and a mezzanine...

September 22, 2017

This project involved the refurbishment of 11 x GP Consulting Rooms, 3 x WCs including one disabled WC, a shower room, kitchen and corridor. All Consulting rooms were completely stripped out and redecorated using anti-bacterial paint, new HTM61 flooring was installed, new blinds fitted and new medical grade work tops and cabinets were also fitted. New sinks and taps were installed to meet HTM64 guidelines. We supplied GP seating, examination lights, privacy blinds, blinds, hand sanitisers, towel dispensers...

September 22, 2017

This 6 week refurbishment involved a complete redesign of the surgery layout to increase the size of clinical areas and waiting areas and to bring the surgery in line with CQC standards; a new reception desk includes a lower section for wheelchair users and a privacy screen provides confidentiality.

The WC was transformed into a universally accessible WC and the staff WCs were also upgraded to include a walk-in shower. We upgraded the electrical supply to the surgery to power the advanced IT capability and...

September 22, 2017

Lavender Hill Group Practice have commissioned 40 reception seats for their newly revamped waiting area and have asked us to modify their recpetion desk to accommodate a lowered counter to welcome wheelchair users. Before installing the anti-microbial, wipeable seats, we sanded and varnished the existing parquet flooring.