October 2021.
After a site visit to take measurements and conduct a survey of existing services, it was decided with the Practice Manager to remove all existing non compliant sinks and taps and replace with IPS units in 7 Consulting Rooms. When old units are removed, this can leave an uncovered section of flooring that requires patching and making good to walls (see photo). Our flooring technician carried this patching out in accordance with DH guidelines and all wall surfaces made good and decorated.
Commentaires