Nick Coughlin Associates Ltd T/A The Furniture Group © 2017

What our clients say:

"The advice, service, planning, build quality, tidiness and completion were all impeccable. A faultless experience as far as our team is concerned"
Dr David Chesover, Senior Partner, Thornhills Medical Practice

"We had an infection control inspection last Friday, the officer could not believe the difference to our clinical rooms. We passed with flying colours :)"
Julie Murphy, Practice Manager, Finchampstead Surgery

"Not only did the chap from the CQC take pictures of your skirting he also said that he thought it was a very high standard professional job as you had coved under/around the plug sockets which he didn't see that often! As far as he is concerned all the jobs have been excellently executed - so well done you deserve it."
Mairead Roche, Practice Manager, Rosslyn Hill Surgery

March 30, 2020

The Furniture Group was commissioned to replace sinks, taps, worktops and flooring in 11 Consulting Rooms at Camberwell Green Surgery. Above are some before and after shots of old, non-compliant sinks and taps  replaced with new compliant sinks taps and worktops and newly laid and coved vinyl flooring.

March 30, 2020

 Before and after shots of a practice in Harley Street. Our client chose Silver Oak vinyl flooring that was coved up to 150mm up the walls and the cabinets.

Our client was very happy:

"I cannot begin to describe how impressed I am with the polite manner, helpfulness and professionalism of the workers.They where absolutely delightful. Not only did they finish off every little detail, bend and corner to perfection, they did it in record time.I cannot compliment them enough. The end result looks like the whol...

March 12, 2020

 We were commissioned by the Lawson Practice to redesign their open plan staff room and kitchen area to incorporate custom -made bench style seating with built in storage, new flooring and lighting, new fitted kitchen. The bench seating was designed to maximise the space available.

January 24, 2020

This project involved the refurbishment of four office spaces. We removed walls to create larger spaces, installed new power supply and data outlets, installed new contract carpet throughout, new lighting including emergency lighting. We also fitted a new air conditioning system and painted the new spaces. A fire detection system and fire doors were also installed.

Please reload

Recent Posts
Please reload

Search by category
Archive
Please reload