The Furniture Group worked with Churchill Medical Centre across three of their practices to refurbish, in total, 13 consulting and treatment rooms. The Surbiton surgery site involved major refurbishment work including the creation of a new exterior entrance door, a raised exterior path to allow wheelchair access, complete electrical re-wire and new flooring throughout the building.
top of page


Recent Posts
See AllJuly 2021. Works included the supply and installation of an IPS unit to include wall mounted tap and sink, the replacement of vinyl flooring to meet HTM61, decorating with anti-bacterial paint and the
0
bottom of page