In October 2018, The Furniture Group completed the installation of 8 IPS units at Ferryview Health Centre. This was to replace electrically operated sensor units which were no longer compliant. We isolated the electrics to each unit and then installed the IPS units. The new wood effect vinyl flooring was coved up the IPS units and storage cabinets to meet current infection control prevention regulations.