The Furniture Group installed 3 new thermostatic mixer taps and sinks with no overflows to 3 consulting rooms at Kings Head Medical Practice. We also installed new vinyl wood effect flooring to the stairs and WCs.
top of page


Recent Posts
See AllJuly 2021. Works included the supply and installation of an IPS unit to include wall mounted tap and sink, the replacement of vinyl flooring to meet HTM61, decorating with anti-bacterial paint and the
0
bottom of page